Empowering engineering excellence

Offshore energy courses

Offshore wind project development

2 (half)day course

Offshore wind project development

Make an offshore wind farm development plan during a two day interactive training course. The focus will lie on the most important decision-making moments when preparing a tender and extra attention will be paid to the effect of covering risks on the offshore wind farm profit.

Dates:
5 and 6 October 2021
Fee:
€ 1.500,00 excl. VAT
 

Why this training course may be of interest to you:

  • Become acquainted with a wind farm development plan during a five phase interactive game
  • Acquire knowledge of the tender preparation procedure
  • Understand what the effect of made choices is during the project preparation on risks and wind farm efficiency
  • Understand the effect that covering risks and other decisions has on a wind farm profit
  • Gain awareness of the various stakeholders involved in different phases of the project preparation process
  • Gain an understanding of the external influences on the different phases of offshore wind project development

Specially developed for professionals wishing to learn more about the different phases of offshore wind project preparation.

Course Content

With the ‘Offshore Wind Project Development’ training course you will get accustomed to the key points in the development plan which are needed to prepare a tender. This training course will focus on the most important decision-making moments in the different phases of tender preparation. The risks and effects of these decisions are highlighted, with particular attention on the effect of covering risks on a wind farm profit. The training course will review the following phases of the tender procedure: project set-up, planning and financing, engineering, installation and maintenance. For each phase, the stakeholders and external influences will be discussed, including the economic, legal and political influences.

The training course consists of seven lectures and a continuous development game, which will be alternated throughout the training course. In this game, you will work on a development plan from the developer’s perspective. The game and lectures will cover the different facets necessary when preparing a tender.

At the end of the last day of the training course, several scenarios will be used to test your development plan. The outcome of these scenarios will show the effect of your choices on a wind farm profit.

Language

The ‘Offshore Wind Project Development’ training course and its materials are written and given entirely in English. However, it will be possible to give the lectures in Dutch if all the participants are Dutch.

Target Audience

This course has been developed for professionals who wish to learn more about the different phases of offshore wind project development and tendering.

Schedule

This training course will be given several times in 2021. The list below shows the dates and the corresponding format in which they are scheduled.

  • 30 September & 1 October two full day hybrid sessions (Europe focus)

Programme

  • Introduction to offshore wind energy
  • Explanation of the offshore wind farm development plan game
  • Site selection and subsidy structures
  • Offshore wind farm design
  • Installation of an offshore wind farm
  • Power price forecasting and contracting strategies, types and structures
  • Work on your offshore wind farm development plan in DOB’s serious game
  • Operation and maintenance
  • Present and discuss the results of your offshore wind farm plan

Contact

For more information please contact Elena Stroo-Moredo at Elena@DOB-Academy.nl or +31 15 240 0555

Hybrid sessions

Until further notice all training courses will be given in either online or hybrid format. Both hybrid and online training courses consist of live-streaming sessions with continuous interaction between the teachers and all participants. The difference between these formats is that during hybrid sessions a small number of participants can attend physically in our building in Delft, while others attend simultaneously via live-streaming. The content of the lectures and cases during a hybrid session is equal for both physical and online participants. All participants receive a DOB-box beforehand containing all materials required for both online and physical participation.

The maximum number of participants allowed at our training courses will depend on the Dutch COVID-19 regulations and may vary over time. Allotting the available physical seats will be done based on the ‘first come first served’ principle.

If necessary, or if we deem fit, we can and will switch from hybrid to online format to safeguard the health of our clients and colleagues. This implies that also the physical participants will have to attend via the live-streaming session online. We do not advise to wait for a next session to attend physically, as we cannot guarantee safe participation at our building months or even weeks ahead of time. DOB-Academy reserves the right to switch from a hybrid to an online format up to 24 hours before the start of the training course.

Location

Click here for information about how to get to DOB-Academy.

Why you should choose DOB-Academy:

  • You will always be trained by experts with years of experience
  • We offer everything from introductory to advanced offshore energy courses
  • Expand your network as you learn
  • 100 percent satisfaction guaranteed
  • All our training courses can be provided on a tailor-made basis

This course is created in cooperation with: